05-Sep-2026 — make the risk assessment intro read-only and save every section with the form ref #381
build 878 — commit caf24de
What's new
On Walk Configuration the risk assessment introduction could be edited just by clicking it, and each section's wording had its own save button, so a section edited and then saved with the form was lost. The introduction is now read-only there, Save and Save and exit save every changed section with the configuration, Undo and Cancel put them back, and a new section appears at the top of the list under the Add section button.